Scherzer - On-Spot Loading & Unloading Systems
Scherzer - On-Spot Loading & Unloading Systems

Dipl.-Ing. Scherzer GmbH

 

On- Spot Loading & Unloading Systems

 

For over  50  years  Dipl.-Ing. SCHERZER GmbH is involved in planning and turnkey construction of facilities for handling  and storage of liquid and gaseous products. Based on this experience Dipl.-Ing. SCHERZER GmbH is among the leading companies in this business.Customersfrom the petroleum and chemical industries and from a range of other sectors at home and abroad value thegroundbreaking technology and  high quality standards ofDipl.-Ing. SCHERZER GmbHas well as theability to address custom applications while optimizing the economic aspectsof thedesigns.

Railcar Loading – Unloading Systems

Railcar  loading  systems On Spot facilities are filling stations for rail cars with a top loading system and a high filling capacity.   The filling of rail cars is similar to a flow line system (sequential procedure). The filling pipe is arranged inside the On Spot facilities on a hydraulically movable filling pipe slide.

 

The emptying of rail cars in semi-automatic or full automatic system. Dipl.-Ing. SCHERZER GmbH plans and delivers not only the rail car unloading plants but interprets the  complete unloading enclosure including incl. automation, loading computer, test value recording system, pipe line system, tension supply, building etc.

Tank Truck Loading – Unloading Systems

The road tanker filling systems are designed according to economical and ecological aspects. They are erected at roofed filling places, designed for handling hazardous products.

 

 

The filling rates can be designed for 2.200 litres/min. A control and data recording systems allows the operator to release all functions. No maloperation or manipulation are possible.  The loading documents are followed and processed in a central measuring station.

Ship Loading – Unloading Systems

The ship is loaded from the tanks involved by means of the pumps of the tank yard via a calibrated and  temperature compensated measuring system.

 

The ship is unloaded by the ship’s pumps or by stationary pumps at the jetty.The measuring values should preferably be recorded by calibrated tank filling level measuring devices, because volumetric measuring systems would require a more comprehensive extent of construction  due to the high vapourvolume in the bilge phase.

LPG Loading – Unloading Systems

The concept of facilities handling liquid hydrocarbons and mixtures thereof meets the highest requirements in terms of fire protection and operational safety and user-friendliness of the complete automated plant.

Tankfarms and Periphery Facilities

  • Power supply of tank yards
  • Construction work such as foundations and collection basins
  • Office, social and workshop buildings
  • Street and road construction
  • Track construction for rail traffic within the storage  facility
  • Drainage and separation systems
  • Pipeline systems and pump stands
  • Steel structures for track roofing and pipe routes
  • Heat and cold generators
  • Compressed air and control air systems
  • Corrosion pro-tection
  • Earthing and lightning protection systems
  • Manual and automatic fire extinguishing systems.
  • Addi-tivesystems
  • Pipeline storage stations

Engineering

  • Determination of bases
  • Preparatory planning
  • Design planning
  • Approval planning
  • Execution planning
  • Construction supervision management
  • Documentation